How to Build a House in Zimbabwe (The Official Process)

Quick Summary

  • First Step: Get architectural plans drawn by a registered architect.
  • Key Approval: Your plans must be approved by your local council before you start any construction.
  • Inspections: The council will conduct mandatory inspections at various stages of construction.
  • Final Document: A Certificate of Occupation is issued once the house is complete and has passed all inspections.
  • Requirement: You cannot legally live in a house without a Certificate of Occupation.

Building your own house is a dream for many, but it involves a strict legal and regulatory process overseen by your local authority (e.g., City of Harare, Bulawayo City Council). Following these steps ensures your house is safe, legal, and officially recognised.

Step 1: Architectural Plans

  1. Hire a Registered Architect: Engage an architect registered with the Architects' Council of Zimbabwe to design your house plans.
  2. Structural Engineer: The plans will also need to be approved and signed by a registered structural engineer.
  3. Plan Details: The plans must be detailed, showing floor plans, elevations, drainage, and structural details.

Step 2: Council Plan Approval

You cannot start building until your plans are officially approved.

  1. Submit Plans: Submit multiple copies of your architectural and structural plans to your local council's building inspectorate department.
  2. Pay Scrutiny Fees: You will need to pay a fee for the council to review your plans.
  3. Review Process: The plans are checked against building bylaws, zoning regulations, and other health and safety standards. This can take several weeks or months.
  4. Receive Approved Plans: Once approved, the plans will be stamped by the council. You will receive a set of these stamped plans.

Step 3: Construction and Inspections

During the building process, council inspectors must visit your site at key stages. It is your responsibility to call them for these inspections.

Mandatory Inspection Stages:

  • Trench/Foundation Inspection: Done after you have dug the foundations but before you pour the concrete.
  • Slab Level Inspection: Done after the concrete slab has been cast.
  • Drainage Inspection: Done after the sewer and drainage pipes have been laid but before they are covered.
  • Roofing Inspection: Done once the roof structure is up.

At each stage, the inspector will sign off on your inspection card if the work is satisfactory. Do not proceed to the next stage without getting the previous one approved.

Step 4: Certificate of Occupation

This is the final and most important document.

  1. Final Inspection: Once the house is complete (including plumbing, electrical, and glazing), you apply for a final inspection.
  2. Issuance: If the building inspector is satisfied that the house was built according to the approved plans and is fit for human habitation, the council will issue a Certificate of Occupation.
  3. Legality: This certificate legally allows you to live in the property and is required to connect permanent water and electricity services.

Common Pitfalls to Avoid

  • Starting Construction Without Approved Plans: This is illegal. The council can order you to demolish any work done and can impose heavy fines.
  • Skipping Stage Inspections: If you miss an inspection (e.g., you cover your drains before they are checked), the council can make you dig them up. This is costly and causes major delays.
  • Deviating from Approved Plans: If you make major changes to the design during construction without getting the plan amendments approved, the council can refuse to issue a Certificate of Occupation.